E-mail:hbcaerd@vip.163.com
Stainless steel 304 material, with corrosion resistance, non rusting, and beautiful appearance.
Product Description
Improves cement ground Performance- stainless steel 304 Steel Flooring are highly wear-resistant Resistant to shock, impact and abrasion as well as high temperatures;
Reduce Maintenance Costs-easy to repairs or replacements necessary due to deterioration or deformation; easy to clean;
Safety use - Smooth, quit surface, reduces dangerous load-spilling bumps and jolts;
Improve transportation efficiency-Industrial trucks and dollies move with less effort, no need worry about heavy transportation crushing the ground;
Saves Money - Low installed cost, no maintenance, and long life.
Features- Corrosion resistance, anti slip,anti-static
Cangzhou Kaiyao is an experienced and specialized manufacturer of stainless steel floor tiles, providing metal flooring solutions for various industrial workshops. Our stainless steel floor tiles offer excellent durability and meet the stringent requirements of industrial environments. Whether you are in the automotive, manufacturing or warehousing industries, our products are the best choice for upgrading your workshop flooring.
1. Durable: Stainless steel floor tiles are resistant to corrosion, impact, abrasion and chemicals, ensuring long-lasting performance and minimal maintenance requirements even in the most demanding industrial environments.
2. Enhanced Safety: Stainless steel flooring has a non-slip feature that reduces the risk of workers slipping and falling in wet work environments. In addition, the smooth and seamless installation of steel floor tiles facilitates the movement of heavy equipment and machinery, increasing workplace safety and productivity.
3. Easy Maintenance: Stainless steel floor tiles are long-lasting and easy to repair. Stainless steel floor tiles are low maintenance, helping to minimize downtime and ensure continuous operation of industrial workshops.
Why Choose Us
-Timely adjustment of production to meet customer delivery time requirements. We have flexible production capacity and can adjust promptly according to customer needs to ensure timely delivery of orders.
-We can accept customized orders. Whether customers require specific sizes, thicknesses, or special surface treatments, we can provide personalized customization services to meet their unique needs.
-We provide after-sales warranty and maintenance services. We take responsibility for product quality, provide warranty services, and can provide maintenance and repair support according to customer needs to ensure long-term stable operation of products.
Customized Solutions
Our metal factory is committed to producing high-quality, customized metal flooring solutions to meet the needs of the construction, industrial, and commercial sectors. With professional expertise and innovative design, we ensure durable, safe, and compliant metal flooring for our clients
Metal Flooring Installation Instructions
Ground reconstruction construction scheme
01
The original floor of the workshop with a wool chisel into a pitted surface
In order to better combine the cement and the ground laid in the later stage, the finished hemp surface is cleaned
02
After cleaning, sprinkle a layer of mortar on the hemp surface
Cement and water into a paste, evenly sprinkle
03
Lay new fine stone concrete (10cm thickness)
Install the metal floor flat on the newly laid cement floor, and make some cement emerge from the floor holes during installation; Install in place as accurately and quickly as possible during the laying process to avoid excessive water overflow from the concrete (water overflow affects the strength of the floor and is not easy to clean up later)
04
Use dry cement to smooth the overflow cement in the floor holes so that the cement is in the same plane as the floor until the floor surface is clean and there are no gaps in the holes
Items 2,3 and 4 should be carried out at the same time to avoid the difficulty of cleaning the cement after drying
05
Do not work or walk on paved surfaces for a week
After the cement is dry, the surface of the floating soil can be swept away and put into use
Installation method
There should leave a gapbetween the two floor wheninstallation,so as to adjust;
Use the rubber or woodhammer hit the floor make surethe floor set in the cement.Add wire mesh wheninstall on the original cementground;
Clearn the extra cementfrom the surface of the floorafter 3 hours,fill up the gapswith cement.
The first installation method
on the new foundation (above is the iron floor sectional drawing)
The second installation method
on the original foundation (above isthe iron floor sectional drawing)
C30 concrete
Iron floor
FAQ
QCan you provide test reports?
Test reports are available from raw materials to finished products. Our products are RoHS certified and have patent certificates.
QDo you accept factory inspections?
Yes, we welcome customers to conduct factory inspections at any time. We can also accommodate third-party inspections upon request.
QWhat are the transportation methods?
We collaborate with logistics companies to safely and swiftly match the optimal transportation method, including road, rail, air, and sea freight.
QDo you provide after-sales service?
Yes, our after-sales service includes, but is not limited to, damage repair, component delivery, and regular maintenance.