E-mail:hbcaerd@vip.163.com
Galvanized steel plate, not resistant to corrosion, with average rust prevention performance, cheap price and high cost-effectiveness
Product Description
Reduce Maintenance Costs-easy to repairs or replacements necessary due to deterioration or deformation; easy to clean;
Safety use - Smooth, quit surface, reduces dangerous load-spilling bumps and jolts;
Improve transportation efficiency-Industrial trucks and dollies move with less effort, no need worry about heavy transportation crushing the ground;
Saves Money - Low installed cost, no maintenance, and long life.
Customized Solutions
Our metal factory is committed to producing high-quality, customized metal flooring solutions to meet the needs of the construction, industrial, and commercial sectors. With professional expertise and innovative design, we ensure durable, safe, and compliant metal flooring for our clients
Metal Flooring Installation Instructions
Ground reconstruction construction scheme
01
The original floor of the workshop with a wool chisel into a pitted surface
In order to better combine the cement and the ground laid in the later stage, the finished hemp surface is cleaned
02
After cleaning, sprinkle a layer of mortar on the hemp surface
Cement and water into a paste, evenly sprinkle
03
Lay new fine stone concrete (10cm thickness)
Install the metal floor flat on the newly laid cement floor, and make some cement emerge from the floor holes during installation; Install in place as accurately and quickly as possible during the laying process to avoid excessive water overflow from the concrete (water overflow affects the strength of the floor and is not easy to clean up later)
04
Use dry cement to smooth the overflow cement in the floor holes so that the cement is in the same plane as the floor until the floor surface is clean and there are no gaps in the holes
Items 2,3 and 4 should be carried out at the same time to avoid the difficulty of cleaning the cement after drying
05
Do not work or walk on paved surfaces for a week
After the cement is dry, the surface of the floating soil can be swept away and put into use
Installation method
There should leave a gapbetween the two floor wheninstallation,so as to adjust;
Use the rubber or woodhammer hit the floor make surethe floor set in the cement.Add wire mesh wheninstall on the original cementground;
Clearn the extra cementfrom the surface of the floorafter 3 hours,fill up the gapswith cement.
The first installation method
on the new foundation (above is the iron floor sectional drawing)
The second installation method
on the original foundation (above isthe iron floor sectional drawing)
C30 concrete
Iron floor
FAQ
QWhat types of materials are available? And what are the thickness options?
We offer materials such as carbon steel plate, galvanized steel plate, 430 stainless steel, and 304 stainless steel.
Thickness options range from 1.2mm, 1.5mm, 2.0mm, 2.5mm to 3.0mm.
QCan you provide customization services?
Yes, we can customize based on requested materials, sizes, and thicknesses, or according to customer-provided drawings.
QDo you offer installation services? Or provide installation tutorials and guidance?
We offer installation services and can provide comprehensive tutorials. Additionally, we can dispatch professional personnel for on-site installation guidance.
QDo you provide after-sales service?
Yes, our after-sales service includes, but is not limited to, damage repair, component delivery, and regular maintenance.